PJM-AG2-370
50 MW storage in Allen, IN · In queue since March 2021 · Proposed COD October 2024
50 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 7m
Schedule
18 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-10-31
PJM-AG2-370 is a proposed 50 MW battery storage project located in Allen County, Indiana. The project is interconnected within the PJM Interconnection queue, with an entry date of March 26, 2021. The proposed commercial operation date is October 31, 2024.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The project is being developed within the American Electric Power (AEP) service area and will connect to the Tillman 138 kV point of interconnection.
Generated from interconnection queue and public data sources
State
IN
County
Allen
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Tillman 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- TILLMAN 138 KV T1
- POI Substation
- Tillman Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-370