500 MW storage in Hancock, OH · In queue since March 2021 · Proposed COD November 2024
500 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 8m
Schedule
18 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-11-15
PJM-AG2-375 is a proposed 500 MW battery storage project located in Hancock County, Ohio. The project, which consists entirely of battery storage, is in the PJM interconnection queue as of March 29, 2021, with a proposed commercial operation date of November 15, 2024. The interconnecting utility is AEP, and the point of interconnection is the Fostoria Central 345 kV substation. The interconnection agreement status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OH
County
Hancock
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Fostoria Central 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WEFOSTOR69 KV T1
- POI Substation
- Fostoria Central Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.