PJM-AG2-382
70 MW generation in Bertie, NC · In queue since March 2021 · Proposed COD September 2024
70 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 6m
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-20
PJM-AG2-382 is a proposed 70 MW solar generation project located in Bertie County, North Carolina. The project is in the PJM interconnection queue, having entered on March 29, 2021, with a proposed commercial operation date of September 20, 2024. Dominion is listed as the utility.
The interconnection agreement for PJM-AG2-382 is currently listed as "In Progress (unknown study)". The point of interconnection is the Cashie 230 kV substation.
Generated from interconnection queue and public data sources
State
NC
County
Bertie
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Cashie 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CASHIE 35 KV TX1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-382