PJM-AG2-384
60 MW storage in Chesterfield, VA · In queue since March 2021 · Proposed COD December 2025
60 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 9m
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-01
PJM-AG2-384 is a proposed 60 MW battery storage project located in Chesterfield County, Virginia. The project is in the PJM interconnection queue as of March 29, 2021, with a proposed commercial operation date of December 1, 2025. Dominion is the utility and the point of interconnection is at Chesterfield 230 kV.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The developer is not specified in the queue data. The project has appeared in recent news coverage regarding energy storage development in the PJM region.
Generated from interconnection queue and public data sources
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Chesterfield 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CHESTER414 KV G3
- POI Substation
- Chesterfield Substation