PJM-AG2-401
44 MW generation in Randolph, IN · In queue since March 2021 · Proposed COD December 2021
44 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2021
Total Duration
9 months
Schedule
53 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-15
PJM-AG2-401 is a proposed solar generation project located in Randolph County, Indiana, within the PJM Interconnection region. The project, with a total capacity of 44 MW, consists entirely of solar photovoltaic technology. Its point of interconnection is the Losantville 345 kV substation.
The project entered the PJM interconnection queue on March 30, 2021, with a proposed commercial operation date of December 15, 2021. The interconnection agreement status is currently listed as "In Progress (unknown study)". The interconnecting utility is AEP.
Generated from interconnection queue and public data sources
State
IN
County
Randolph
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Losantville 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.