PJM-AG2-402
50 MW storage in Allen, IN · In queue since March 2021 · Proposed COD October 2025
50 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 7m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-31
PJM-AG2-402 is a proposed 50 MW battery storage project located in Allen County, Indiana. The project is interconnected within the PJM Interconnection queue, with an entry date of March 30, 2021. The proposed commercial operation date is October 31, 2025.
The interconnection agreement for the project with utility AEP is currently in progress, with the specific study status unknown. The point of interconnection is at the Allen 345 kV substation.
Generated from interconnection queue and public data sources
State
IN
County
Allen
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Allen 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Allen IM Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-402