PJM-AG2-406
10.98 MW generation in Paulding, OH · In queue since March 2021 · Proposed COD October 2022
10.98 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
1y 7m
Schedule
43 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-10-31
The proposed project PJM-AG2-406 is a 10.98 MW solar generation project located in Paulding County, Ohio. It is interconnected within the PJM Interconnection queue, with a queue entry date of March 30, 2021. The proposed commercial operation date is October 31, 2022. The interconnecting utility is AEP, and the point of interconnection is the Payne 69 kV substation.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
State
OH
County
Paulding
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Payne 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- PAYNE 34.5 KV TIMBERSP
- POI Substation
- Payne Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-406