Project PJM-AG2-408 — Project Summary

Queue ID
PJM-AG2-408
Capacity
18 MW
Technology
Solar
Status
active
Location
Allen, IN
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-408

PJM-AG2-408BetaActiveSolarPJMLBNL

18 MW generation in Allen, IN · In queue since March 2021 · Proposed COD September 2022

18 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2022

Interconnection

Total Duration

1y 6m

Schedule

44 months past proposed COD

In Study38%
Queue EntryMar 30, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-09-30

About

PJM-AG2-408 is a proposed 18 MW solar generation project located in Allen County, Indiana. The project is interconnected within the PJM Interconnection queue, with an initial queue entry date of March 30, 2021. The proposed commercial operation date is September 30, 2022. The interconnecting utility is AEP.

The project's interconnection agreement status is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

IN

County

Allen

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Allen 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
POI Substation
Allen IM Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG2-408