Project PJM-AG2-427 — Project Summary

Queue ID
PJM-AG2-427
Capacity
85 MW
Technology
Solar+Battery
Status
active
Location
Sussex, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-427

PJM-AG2-427BetaActiveSolarBatteryPJMLBNL

85 MW hybrid in Sussex, VA · In queue since March 2021 · Proposed COD February 2024

85 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

2y 11m

Schedule

26 months past proposed COD

In Study38%
Queue EntryMar 30, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-02-29

About

The proposed project PJM-AG2-427 is an 85 MW hybrid solar and battery energy storage development project located in Sussex County, Virginia. Interconnecting to the Dominion utility via the Waverly 115 kV point of interconnection, the project consists of 85 MW of solar generation.

The project is in the PJM interconnection queue with an entry date of March 30, 2021, and a proposed commercial operation date of February 29, 2024. Its interconnection agreement status is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Sussex

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Waverly 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
ESAYRE 34.5 KV SUNYSIDE
POI Substation
North Waverly Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.