PJM-AG2-439
9.8 MW generation in Wyoming, PA · In queue since March 2021 · Proposed COD June 2023
9.8 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 3m
Schedule
35 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-15
PJM-AG2-439 is a proposed solar generation project located in Wyoming County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 9.8 MW, consists entirely of solar photovoltaic generation. Its point of interconnection is the Oxbow 34.5 kV substation.
The project entered the PJM interconnection queue on March 30, 2021, with a proposed commercial operation date of June 15, 2023. As of the latest data, the project's interconnection agreement status is listed as "In Progress (unknown study)". The interconnecting utility is PENELEC.
Generated from interconnection queue and public data sources
State
PA
County
Wyoming
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Oxbow 34.5 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- OXBOW 34.5 KV OXBOWGT
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-439