Project PJM-AG2-439 — Project Summary

Queue ID
PJM-AG2-439
Capacity
9.8 MW
Technology
Solar
Status
active
Location
Wyoming, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-439

PJM-AG2-439BetaActiveSolarPJMLBNL

9.8 MW generation in Wyoming, PA · In queue since March 2021 · Proposed COD June 2023

9.8 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 3m

Schedule

35 months past proposed COD

In Study38%
Queue EntryMar 30, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-06-15

About

PJM-AG2-439 is a proposed solar generation project located in Wyoming County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 9.8 MW, consists entirely of solar photovoltaic generation. Its point of interconnection is the Oxbow 34.5 kV substation.

The project entered the PJM interconnection queue on March 30, 2021, with a proposed commercial operation date of June 15, 2023. As of the latest data, the project's interconnection agreement status is listed as "In Progress (unknown study)". The interconnecting utility is PENELEC.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Wyoming

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Oxbow 34.5 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
OXBOW 34.5 KV OXBOWGT

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.