PJM-AG2-448
150 MW hybrid in Mineral, WV · In queue since March 2021 · Proposed COD March 2024
150 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3 years
Schedule
26 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-03-24
The proposed project PJM-AG2-448 is a 150 MW hybrid solar and battery energy storage project located in Mineral County, West Virginia. Interconnecting within the PJM Interconnection queue under utility APS, the project entered the queue on March 30, 2021, with a proposed commercial operation date of March 24, 2024. The point of interconnection is at the Cross School - Westvaco 138 kV substation.
The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The project consists of 150 MW of solar generation capacity. It has appeared in recent news coverage regarding renewable energy development in the region.
Generated from interconnection queue and public data sources
State
WV
County
Mineral
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Cross School - Westvaco 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WESTVACO138 KV WVACO G1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-448