Project PJM-AG2-448 — Project Summary

Queue ID
PJM-AG2-448
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Mineral, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-448

PJM-AG2-448BetaActiveSolarBatteryPJMLBNL

150 MW hybrid in Mineral, WV · In queue since March 2021 · Proposed COD March 2024

150 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3 years

Schedule

26 months past proposed COD

In Study38%
Queue EntryMar 30, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-03-24

About

The proposed project PJM-AG2-448 is a 150 MW hybrid solar and battery energy storage project located in Mineral County, West Virginia. Interconnecting within the PJM Interconnection queue under utility APS, the project entered the queue on March 30, 2021, with a proposed commercial operation date of March 24, 2024. The point of interconnection is at the Cross School - Westvaco 138 kV substation.

The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The project consists of 150 MW of solar generation capacity. It has appeared in recent news coverage regarding renewable energy development in the region.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Mineral

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Cross School - Westvaco 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
WESTVACO138 KV WVACO G1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG2-448