PJM-AG2-454
300 MW generation in Fountain, IN · In queue since March 2021 · Proposed COD March 2024
300 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3 years
Schedule
25 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-03-31
PJM-AG2-454 is a proposed solar generation project with a total capacity of 300 MW. The project is located in Fountain County, Indiana, within the PJM Interconnection region. The queue entry date is March 30, 2021, with a proposed commercial operation date of March 31, 2024.
The interconnection status for PJM-AG2-454 is listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection is the Dequine - Eugene 345 kV line.
Generated from interconnection queue and public data sources
State
IN
County
Fountain
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Dequine - Eugene 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.