PJM-AG2-505
15 MW generation in Garrett, MD · In queue since March 2021 · Proposed COD December 2023
15 MW
Capacity
1
Components
Hydro
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG2-505 is a proposed 15 MW hydroelectric generation project located in Garrett County, Maryland. The project is in the PJM interconnection queue as of March 31, 2021, with a proposed commercial operation date of December 31, 2023. The interconnecting utility is APS.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Westvaco - Mt Zion 138 kV substation.
Generated from interconnection queue and public data sources
State
MD
County
Garrett
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Westvaco - Mt Zion 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WESTVACO138 KV WVACO G1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-505