PJM-AG2-524
110 MW hybrid in Grundy, IL · In queue since March 2021 · Proposed COD December 2023
110 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG2-524 is a proposed 110 MW hybrid solar and battery project located in Grundy County, Illinois. The project consists of 110 MW of solar generation. It is interconnected within the PJM Interconnection queue, having entered the queue on March 31, 2021, with a proposed commercial operation date of December 31, 2023. The interconnection agreement is currently listed as "In Progress (unknown study)".
The proposed project is located within the ComEd utility service area and its point of interconnection is the LaSalle Station - Mazon 138 kV substation.
Generated from interconnection queue and public data sources
State
IL
County
Grundy
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
LaSalle Station - Mazon 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- POI Substation
- Station 2
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.