Project PJM-AG2-528 — Project Summary

Queue ID
PJM-AG2-528
Capacity
140 MW
Technology
Solar+Battery
Status
active
Location
Rockbridge, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-528

PJM-AG2-528BetaActiveSolarBatteryPJMLBNL

140 MW hybrid in Rockbridge, VA · In queue since March 2021 · Proposed COD October 2024

140 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 7m

Schedule

18 months past proposed COD

In Study38%
Queue EntryMar 31, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-10-31

About

PJM-AG2-528 is a proposed 140 MW hybrid solar and battery project located in Rockbridge County, Virginia. The project, which consists of 140 MW of solar generation, is in the PJM interconnection queue as of March 31, 2021, with a proposed commercial operation date of October 31, 2024. The interconnecting utility is Dominion.

The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Bustleburg Tap - Fairfield DP 115 kV. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Rockbridge

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Bustleburg Tap - Fairfield DP 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.