Project PJM-AG2-541 — Project Summary

Queue ID
PJM-AG2-541
Capacity
65 MW
Technology
Solar+Battery
Status
active
Location
Halifax, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-541

PJM-AG2-541BetaActiveSolarBatteryPJMLBNL

65 MW hybrid in Halifax, VA · In queue since March 2021 · Proposed COD June 2024

65 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 3m

Schedule

23 months past proposed COD

In Study38%
Queue EntryMar 31, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-06-03

About

PJM-AG2-541 is a proposed 65 MW hybrid solar and battery project located in Halifax County, Virginia. The project, which consists of 65 MW of solar capacity, is interconnected within the PJM Interconnection queue. Its queue entry date is March 31, 2021, with a proposed commercial operation date of June 3, 2024. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".

The project is within Dominion Energy's service territory. No developer is listed in the queue. The point of interconnection (POI) is the Perth - Crystal Hill 115 kV substation. The project has not appeared in recent news, nor is it linked to an existing operating plant in the EIA database.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Halifax

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Perth - Crystal Hill 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.