PJM-AG2-544
200 MW storage in Mchenry, IL · In queue since March 2021 · Proposed COD November 2024
200 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 8m
Schedule
18 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-11-06
PJM-AG2-544 is a proposed 200 MW battery storage project located in McHenry County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 31, 2021. The proposed commercial operation date is November 6, 2024.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The project is located within the ComEd service territory and connects to the Silver Lake 138 kV point of interconnection.
Generated from interconnection queue and public data sources
State
IL
County
Mchenry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Silver Lake 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 75 CRYST138 KV TR71 12
- POI Substation
- Silver Lake Substation