PJM-AG2-553
50 MW storage in Bullitt, KY · In queue since March 2021 · Proposed COD September 2024
50 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 6m
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-01
PJM-AG2-553 is a proposed 50 MW battery storage project located in Bullitt County, Kentucky. The project is in the PJM interconnection queue, having entered on March 31, 2021, with a proposed commercial operation date of September 1, 2024. The interconnecting utility is EKPC.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Bullitt County 161 kV substation.
Generated from interconnection queue and public data sources
State
KY
County
Bullitt
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Bullitt County 161 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.