PJM-AG2-562
71 MW generation in St. Joseph, IN · In queue since March 2021 · Proposed COD October 2022
71 MW
Capacity
1
Components
Gas
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
1y 7m
Schedule
43 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-10-31
PJM-AG2-562 is a proposed 71 MW gas-fired generation project located in St. Joseph County, Indiana. The project is in the PJM interconnection queue as of March 31, 2021, with a proposed commercial operation date of October 31, 2022. The interconnecting utility is AEP.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Elderberry 345 kV substation.
Generated from interconnection queue and public data sources
State
IN
County
St. Joseph
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Elderberry 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SJEC 18 KV STG
- POI Substation
- Elderberry Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-562