PJM-AG2-571
100 MW storage in Brunswick, VA · In queue since March 2021 · Proposed COD March 2024
100 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3 years
Schedule
26 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-03-29
PJM-AG2-571 is a proposed 100 MW battery storage project located in Brunswick County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 31, 2021, with a proposed commercial operation date of March 29, 2024. Dominion is the utility associated with the project.
The interconnection agreement (IA) status for PJM-AG2-571 is currently "In Progress (unknown study)". The point of interconnection (POI) is the Brunswick Collector Bus - Wake 500 kV.
Generated from interconnection queue and public data sources
State
VA
County
Brunswick
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Brunswick Collector Bus - Wake 500 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BRUNSWIC26 KV BRUNSWSP
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-571