PJM-AG2-575
100 MW hybrid in Dekalb, IL · In queue since March 2021 · Proposed COD December 2024
100 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 9m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
PJM-AG2-575 is a proposed 100 MW hybrid solar and battery project located in Dekalb County, Illinois. The project, interconnecting to the ComEd utility at the Glidden-Waterman 138 kV point of interconnection, entered the PJM interconnection queue on March 31, 2021, with a proposed commercial operation date of December 31, 2024.
The interconnection agreement for PJM-AG2-575 is currently in progress, with the specific study phase unknown. The project consists of 100 MW of solar generation capacity, and also includes battery storage.
Generated from interconnection queue and public data sources
State
IL
County
Dekalb
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Glidden-Waterman 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-575