Project PJM-AG2-582 — Project Summary

Queue ID
PJM-AG2-582
Capacity
2100 MW
Technology
Gas
Status
active
Location
Doddridge, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-582

PJM-AG2-582BetaActiveGasPJMLBNL

2,100 MW generation in Doddridge, WV · In queue since March 2021 · Proposed COD July 2026

2,100 MW

Capacity

1

Components

Gas

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

5y 4m

In Study38%
Queue EntryMar 31, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-07-01

About

PJM-AG2-582 is a proposed 2100 MW gas-fired generation project located in Doddridge County, West Virginia. The project is in the PJM interconnection queue as of March 31, 2021, with a proposed commercial operation date of July 1, 2026. The interconnecting utility is APS.

The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Belmont-Flint Run 500 kV line.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Doddridge

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Belmont-Flint Run 500 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.