PJM-AG2-589
20 MW generation in Meigs, OH · In queue since March 2021 · Proposed COD June 2024
20 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 3m
Schedule
23 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-06-01
The proposed project PJM-AG2-589 is a 20 MW solar generation project located in Meigs County, Ohio. The project is interconnected within the PJM Interconnection queue, with a queue entry date of March 31, 2021. The proposed commercial operation date is June 1, 2024.
The interconnection agreement (IA) status for the project is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Ravenswood Hemlock 69 kV line. The interconnecting utility is AEP.
Generated from interconnection queue and public data sources
State
OH
County
Meigs
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Ravenswood Hemlock 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.