Project PJM-AG2-603 — Project Summary

Queue ID
PJM-AG2-603
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Carroll, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-603

PJM-AG2-603BetaActiveSolarBatteryPJMLBNL

150 MW hybrid in Carroll, VA · In queue since March 2021 · Proposed COD October 2024

150 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 7m

Schedule

18 months past proposed COD

In Study38%
Queue EntryMar 31, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-10-31

About

PJM-AG2-603 is a proposed 150 MW hybrid Solar+Battery project located in Carroll County, Virginia. Interconnection is being managed through the PJM queue, with an entry date of March 31, 2021. The proposed commercial operation date is October 31, 2024. The interconnection agreement status is listed as "In Progress (unknown study)".

The project consists of 150 MW of solar generation capacity. The interconnection utility is AEP, and the point of interconnection is Huffman 138 kV. The project is currently listed as active in the PJM interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Carroll

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Huffman 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
HUFFMAN 138 KV T2
POI Substation
Huffman Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.