PJM-AG2-617
55 MW generation in Anne Arundel, MD · In queue since March 2021 · Proposed COD December 2023
55 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG2-617 is a proposed 55 MW solar generation project located in Anne Arundel County, Maryland. The project is interconnected to the Baltimore Gas and Electric (BGE) system via the Waugh Chapel 115 kV point of interconnection. It entered the PJM interconnection queue on March 31, 2021, with a proposed commercial operation date of December 31, 2023.
The interconnection agreement (IA) for PJM-AG2-617 is currently listed as "In Progress (unknown study)". The developer is not specified in the queue data, and there is no indication of recent news coverage or a link to an existing operating plant.
Generated from interconnection queue and public data sources
State
MD
County
Anne Arundel
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
BGE
Entity
PJM
Service Type
—
Point of Interconnection
Waugh Chapel 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- NAJ 13.8 KV MILSVILF
- POI Substation
- Waugh Chapel Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-617