Project PJM-AG2-625 — Project Summary

Queue ID
PJM-AG2-625
Capacity
19.6 MW
Technology
Solar
Status
active
Location
Warren, NJ
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-625

PJM-AG2-625BetaActiveSolarPJMLBNL

19.6 MW generation in Warren, NJ · In queue since March 2021 · Proposed COD April 2021

19.6 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2021

Interconnection

Total Duration

1 month

Schedule

61 months past proposed COD

In Study38%
Queue EntryMar 31, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-04-30

About

PJM-AG2-625 is a proposed solar generation project with a total capacity of 19.6 MW, located in Warren County, New Jersey. The project is interconnected within the PJM Interconnection queue as of March 31, 2021, with a proposed commercial operation date of April 30, 2021. The interconnection agreement status is listed as "In Progress (unknown study)". The designated point of interconnection (POI) is Pequest River-Furnace Brook Tap 34.5 kV II, and the utility is JCPL.

The development project consists solely of solar photovoltaic generation, with the 19.6 MW capacity attributed to this technology. The project's status within the PJM queue is currently listed as active.

Generated from interconnection queue and public data sources

Project Details

State

NJ

County

Warren

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

JCPL

Entity

PJM

Service Type

Point of Interconnection

Pequest River-Furnace Brook Tap 34.5 kV II

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.