PJM-AG2-646
200 MW storage in Chesterfield, VA · In queue since March 2021 · Proposed COD June 2024
200 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 3m
Schedule
23 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-06-10
PJM-AG2-646 is a proposed 200 MW battery storage project located in Chesterfield County, Virginia. The project is in the PJM interconnection queue as of March 31, 2021, with a proposed commercial operation date of June 10, 2024. Dominion is the listed utility.
The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Chesterfield 230 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Chesterfield 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CHESTER414 KV G3
- POI Substation
- Chesterfield Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-646