PJM-AG2-654
14.7 MW generation in Armstrong, PA · In queue since March 2021 · Proposed COD June 2022
14.7 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
1y 3m
Schedule
48 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-06-01
PJM-AG2-654 is a proposed solar generation project located in Armstrong County, Pennsylvania, with a total capacity of 14.7 MW. The project, which is in the PJM interconnection queue, entered the queue on March 31, 2021, and has a proposed commercial operation date of June 1, 2022. The interconnecting utility is APS.
The interconnection agreement status for PJM-AG2-654 is listed as "In Progress (unknown study)". The point of interconnection is Cowansville Junction _x0013_ Long Run Tap 25 kV.
Generated from interconnection queue and public data sources
State
PA
County
Armstrong
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Cowansville Junction _x0013_ Long Run Tap 25 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.