Project PJM-AG2-655 — Project Summary

Queue ID
PJM-AG2-655
Capacity
500 MW
Technology
Solar
Status
active
Location
Grant, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-655

PJM-AG2-655BetaActiveSolarPJMLBNL

500 MW generation in Grant, WV · In queue since March 2021 · Proposed COD June 2024

500 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 3m

Schedule

22 months past proposed COD

In Study38%
Queue EntryMar 31, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-06-30

About

PJM-AG2-655 is a proposed solar generation project with a total capacity of 500 MW, located in Grant County, West Virginia. The project is in the PJM interconnection queue as of March 31, 2021, with a proposed commercial operation date of June 30, 2024. The interconnection agreement status is listed as "In Progress (unknown study)".

The proposed project is being developed within the Dominion utility territory and interconnects at the Mt. Storm-Bismark 500 kV point of interconnection.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Grant

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Mt. Storm-Bismark 500 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.