PJM-AG2-657
90 MW hybrid in Fayette, WV · In queue since March 2021 · Proposed COD June 2024
90 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 3m
Schedule
22 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-06-30
The proposed project PJM-AG2-657 is a 90 MW hybrid solar and battery energy storage development project located in Fayette County, West Virginia. The project, interconnecting to the Carbondale 138 kV point of interconnection, consists of 90 MW of solar generation.
The project is in the PJM interconnection queue, with an entry date of March 31, 2021, and a proposed commercial operation date of June 30, 2024. The interconnection agreement is currently listed as "In Progress (unknown study)". The interconnecting utility is AEP.
Generated from interconnection queue and public data sources
State
WV
County
Fayette
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Carbondale 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- East Carbondale Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.