Project PJM-AG2-665 — Project Summary

Queue ID
PJM-AG2-665
Capacity
90 MW
Technology
Solar+Battery
Status
active
Location
Jackson, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-665

PJM-AG2-665BetaActiveSolarBatteryPJMLBNL

90 MW hybrid in Jackson, OH · In queue since March 2021 · Proposed COD December 2024

90 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 9m

Schedule

16 months past proposed COD

In Study38%
Queue EntryMar 31, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-31

About

The proposed project PJM-AG2-665 is a 90 MW hybrid solar and battery energy storage development project located in Jackson County, Ohio. Interconnecting to the PJM Interconnection queue under utility AEP, the project entered the queue on March 31, 2021, and has a proposed commercial operation date of December 31, 2024.

The project consists of 90 MW of solar generation capacity. Its interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Corwin - Elk 138 kV line. The project is listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Jackson

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Corwin - Elk 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG2-665