PJM-AG2-670
75 MW generation in Green, KY · In queue since March 2021 · Proposed COD December 2023
75 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG2-670 is a proposed 75 MW solar generation project located in Green County, Kentucky. The project is listed in the PJM interconnection queue with an entry date of March 31, 2021. The proposed commercial operation date is December 31, 2023.
The interconnection agreement for the project with utility EKPC is currently listed as "In Progress (unknown study)". The point of interconnection is the Greensburg 69 kV substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
KY
County
Green
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Greensburg 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Greensburg Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-670