PJM-AH1-004
40 MW generation in Fayette, KY · In queue since April 2021 · Proposed COD December 2023
40 MW
Capacity
1
Components
Solar
5y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 8m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-01
PJM-AH1-004 is a proposed solar generation project with a total capacity of 40 MW. The project is located in Fayette County, Kentucky, and is being developed within the PJM Interconnection region. The queue entry date for the project is April 7, 2021, with a proposed commercial operation date of December 1, 2023. The interconnection utility is EKPC.
The project's interconnection status is listed as "In Progress (unknown study)". The point of interconnection is the Avon - Renaker 138 kV line.
Generated from interconnection queue and public data sources
State
KY
County
Fayette
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Avon - Renaker 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.