Project PJM-AH1-035 — Project Summary

Queue ID
PJM-AH1-035
Capacity
20 MW
Technology
Solar
Status
active
Location
Washington, NC
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-035

PJM-AH1-035BetaActiveSolarPJMLBNL

20 MW generation in Washington, NC · In queue since June 2021 · Proposed COD September 2024

20 MW

Capacity

1

Components

Solar

4y 11m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 3m

Schedule

20 months past proposed COD

In Study38%
Queue EntryJun 14, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-09-15

About

PJM-AH1-035 is a proposed 20 MW solar generation project located in Washington County, North Carolina. The project is interconnected within the PJM Interconnection queue, with a queue entry date of June 14, 2021. Dominion is the utility associated with the project. The proposed commercial operation date is September 15, 2024. The interconnection agreement status is listed as "In Progress (unknown study)".

The development project consists of 20 MW of solar photovoltaic generation. The point of interconnection is the Plymouth 34.5 kV substation. The project is currently listed as active in the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

NC

County

Washington

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Plymouth 34.5 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
MONTCO 13 KV MONTCO
POI Substation
Plymouth Meeting 138 kV Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.