Project PJM-AH1-040 — Project Summary

Queue ID
PJM-AH1-040
Capacity
150 MW
Technology
Solar
Status
active
Location
Washington, NC
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-040

PJM-AH1-040BetaActiveSolarPJMLBNL

150 MW generation in Washington, NC · In queue since June 2021 · Proposed COD July 2025

150 MW

Capacity

1

Components

Solar

4y 11m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

4y 1m

Schedule

10 months past proposed COD

In Study38%
Queue EntryJun 23, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-07-01

About

PJM-AH1-040 is a proposed solar generation project with a total capacity of 150 MW, located in Washington County, North Carolina. The project is being developed within the Dominion service area and is interconnected to the PJM grid at the Mackeys - Creswell 115 kV point of interconnection. The project entered the PJM interconnection queue on June 23, 2021, with a proposed commercial operation date of July 1, 2025. The interconnection agreement is currently listed as "In Progress (unknown study)".

The proposed project consists of 150 MW of solar photovoltaic generation. It is currently listed as an active project within the PJM interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

NC

County

Washington

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Mackeys - Creswell 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.