PJM-AH1-045
23 MW generation in Lake, IL · In queue since July 2021 · Proposed COD June 2023
23 MW
Capacity
1
Components
Solar
4y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
1y 11m
Schedule
36 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-01
PJM-AH1-045 is a proposed solar generation project with a total capacity of 23 MW, located in Lake County, Illinois. The project is interconnected within the PJM Interconnection queue, with an entry date of July 1, 2021, and a proposed commercial operation date of June 1, 2023. The interconnecting utility is ComEd.
The interconnection agreement (IA) status for the project is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Zion Energy Center 345 kV substation.
Generated from interconnection queue and public data sources
State
IL
County
Lake
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Zion Energy Center 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 937 LEE 13.5 KV LEE31-1
- POI Substation
- Lee County Energy Center Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-045