PJM-AH1-046
25 MW generation in York, PA · In queue since July 2021 · Proposed COD June 2023
25 MW
Capacity
1
Components
Solar
4y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
1y 11m
Schedule
36 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-01
The proposed project PJM-AH1-046 is a 25 MW solar generation project located in York County, Pennsylvania. The project is in the PJM interconnection queue, with an entry date of July 1, 2021, and a proposed commercial operation date of June 1, 2023. The interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project is located within the PECO utility territory and interconnects at the Peach Bottom 500 kV point of interconnection. The project consists of 25 MW of solar capacity. The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
State
PA
County
York
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PECO
Entity
PJM
Service Type
—
Point of Interconnection
Peach Bottom 500 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- PEACHBOT22 KV UNIT02
- POI Substation
- Peach Bottom North Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-046