Project PJM-AH1-070 — Project Summary

Queue ID
PJM-AH1-070
Capacity
17 MW
Technology
Solar
Status
active
Location
Ashland, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-070

PJM-AH1-070BetaActiveSolarPJMLBNL

17 MW generation in Ashland, OH · In queue since July 2021 · Proposed COD November 2023

17 MW

Capacity

1

Components

Solar

4y 10m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 4m

Schedule

30 months past proposed COD

In Study38%
Queue EntryJul 28, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-11-30

About

PJM-AH1-070 is a proposed solar generation project with a total capacity of 17 MW, located in Ashland County, Ohio. The project is interconnected within the PJM Interconnection queue under queue ID PJM-AH1-070. The queue entry date is July 28, 2021, with a proposed commercial operation date of November 30, 2023. The interconnection agreement status is currently listed as "In Progress (unknown study)".

The proposed project is being developed within the ATSI utility territory. It consists of 17 MW of solar photovoltaic generation. The point of interconnection is the Jerome _x0013_ Mohicanville 69 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Ashland

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

Point of Interconnection

Jerome _x0013_ Mohicanville 69 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-070