Project PJM-AH1-072 — Project Summary

Queue ID
PJM-AH1-072
Capacity
20 MW
Technology
Solar
Status
active
Location
Dickenson, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-072

PJM-AH1-072BetaActiveSolarPJMLBNL

20 MW generation in Dickenson, VA · In queue since July 2021 · Proposed COD March 2024

20 MW

Capacity

1

Components

Solar

4y 10m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

2y 8m

Schedule

25 months past proposed COD

In Study38%
Queue EntryJul 29, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-03-31

About

PJM-AH1-072 is a proposed solar generation project with a total capacity of 20 MW, located in Dickenson County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on July 29, 2021. The proposed commercial operation date is March 31, 2024. The interconnection agreement status is listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection is the Lick Fork 69 kV substation.

The development project consists solely of solar generation, with the 20 MW total capacity attributed to solar photovoltaic technology. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Dickenson

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Lick Fork 69 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-072