PJM-AH1-082
44 MW generation in Metcalfe, KY · In queue since July 2021 · Proposed COD December 2024
44 MW
Capacity
1
Components
Solar
4y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 5m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-20
PJM-AH1-082 is a proposed solar generation project located in Metcalfe County, Kentucky, with a total capacity of 44 MW. The project consists of 44 MW of solar photovoltaic generation. It is listed in the PJM interconnection queue as of July 30, 2021, with a proposed commercial operation date of December 20, 2024. The interconnection agreement status is currently "In Progress (unknown study)". The interconnecting utility is EKPC.
The development project is interconnected at the Knob Lick 69kV point of interconnection.
Generated from interconnection queue and public data sources
State
KY
County
Metcalfe
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Knob Lick 69kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-082