Project PJM-AH1-106 — Project Summary

Queue ID
PJM-AH1-106
Capacity
26 MW
Technology
Solar
Status
active
Location
Chesterfield, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-106

PJM-AH1-106BetaActiveSolarPJMLBNL

26 MW generation in Chesterfield, VA · In queue since August 2021 · Proposed COD October 2023

26 MW

Capacity

1

Components

Solar

4y 9m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 2m

Schedule

31 months past proposed COD

In Study38%
Queue EntryAug 4, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-10-31

About

PJM-AH1-106 is a proposed solar generation project located in Chesterfield County, Virginia. The project, with a total capacity of 26 MW, is being developed within the Dominion service territory. It entered the PJM interconnection queue on August 4, 2021, with a proposed commercial operation date of October 31, 2023.

The interconnection agreement (IA) for PJM-AH1-106 is currently listed as "In Progress" with an unknown study. The point of interconnection (POI) for the project is the Winterpock 34.5kV substation. The project has appeared in recent news coverage regarding renewable energy development in the PJM region.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Chesterfield

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Winterpock 34.5kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.