PJM-AH1-147
200 MW generation in Ogle, IL · In queue since August 2021 · Proposed COD December 2025
200 MW
Capacity
1
Components
Solar
4y 9m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 4m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
PJM-AH1-147 is a proposed 200 MW solar generation project located in Ogle County, Illinois. The project is interconnected within the PJM Interconnection queue as of August 27, 2021, with a proposed commercial operation date of December 31, 2025. The interconnecting utility is ComEd.
The interconnection agreement for PJM-AH1-147 is currently listed as "In Progress (unknown study)". The point of interconnection is the Byron-Wayne 345 kV line. The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
State
IL
County
Ogle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Byron-Wayne 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-147