PJM-AH1-170
20 MW generation in Goochland, VA · In queue since August 2021 · Proposed COD December 2024
20 MW
Capacity
1
Components
Solar
4y 9m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 4m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-20
PJM-AH1-170 is a proposed 20 MW solar generation project located in Goochland County, Virginia. The project is being developed within the Dominion service area and is interconnected to the PJM grid at the Columbia DP 115kV point of interconnection.
The project entered the PJM interconnection queue on August 27, 2021, with a proposed commercial operation date of December 20, 2024. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
VA
County
Goochland
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Columbia DP 115kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- COLU BC 13.8 KV 230-2LD
- POI Substation
- Columbia Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-170