PJM-AH1-197
7.1 MW generation in Fairfax, VA · In queue since September 2021 · Proposed COD August 2021
7.1 MW
Capacity
1
Components
Other
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2021
Total Duration
4y 8m
Schedule
57 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-08-20
PJM-AH1-197 is a proposed generation project located in Fairfax County, Virginia, within the Dominion service area. The project, with a total capacity of 7.1 MW, consists of a single 7.1 MW component listed as "Other" technology. It is currently active in the PJM interconnection queue, having entered on September 1, 2021, with a proposed commercial operation date of August 20, 2021. The interconnection agreement is currently listed as "In Progress (unknown study)".
The interconnection point of contact is the Occoquan 230kV substation. The developer is unknown. The project has appeared in the PJM interconnection queue but has not been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
VA
County
Fairfax
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Occoquan 230kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- OCCOQUAN35 KV I95LF
- POI Substation
- Occoquan Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-197