PJM-AH1-206
60 MW storage in Fayette, PA · In queue since September 2021 · Proposed COD December 2024
60 MW
Capacity
1
Components
Battery
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 3m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
PJM-AH1-206 is a proposed 60 MW battery storage project located in Fayette County, Pennsylvania. The project is in the PJM interconnection queue as of September 8, 2021, with a proposed commercial operation date of December 31, 2024. The interconnection utility is APS, and the point of interconnection is Bethelboro 138 kV.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The development project consists solely of battery storage, with a total capacity of 60 MW.
Generated from interconnection queue and public data sources
State
PA
County
Fayette
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Bethelboro 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BETHELBO138 KV T62
- POI Substation
- Bethelboro Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-206