PJM-AH1-212
20 MW generation in Cambria, PA · In queue since September 2021 · Proposed COD December 2022
20 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
1y 3m
Schedule
41 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-12-31
PJM-AH1-212 is a proposed solar generation project located in Cambria County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 20 MW, consists entirely of solar photovoltaic technology. The proposed commercial operation date is December 31, 2022.
The project is currently active in the PJM interconnection queue, having entered the queue on September 7, 2021. Its interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Bethlehem - Lilly 46 kV line, and the interconnecting utility is PENELEC.
Generated from interconnection queue and public data sources
State
PA
County
Cambria
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Bethlehem - Lilly 46 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.