20 MW storage in Loudoun, VA · In queue since September 2021 · Proposed COD December 2023
20 MW
Capacity
1
Components
Battery
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 3m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-01
PJM-AH1-223 is a proposed 20 MW battery storage project located in Loudoun County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 8, 2021. Dominion is the utility associated with the project.
The proposed commercial operation date for PJM-AH1-223 is December 1, 2023. The interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Poland Rd-Runway DP 230 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Loudoun
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Poland Rd-Runway DP 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-223