PJM-AH1-239
80 MW generation in Boone, KY · In queue since September 2021 · Proposed COD December 2024
80 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 3m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
PJM-AH1-239 is a proposed solar generation project with a total capacity of 80 MW, located in Boone County, Kentucky. The project is being developed within the PJM Interconnection queue, with a queue entry date of September 9, 2021, and a proposed commercial operation date of December 31, 2024. The interconnecting utility is EKPC.
The project's interconnection status is currently listed as "In Progress (unknown study)". It is interconnected at the Upchurch - Zula 69 kV point of interconnection.
Generated from interconnection queue and public data sources
State
KY
County
Boone
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Upchurch - Zula 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.