Project PJM-AH1-254 — Project Summary

Queue ID
PJM-AH1-254
Capacity
207.6 MW
Technology
Wind
Status
active
Location
Barbour, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-254

PJM-AH1-254BetaActiveWindPJMLBNL

207.6 MW generation in Barbour, WV · In queue since September 2021 · Proposed COD July 2025

207.6 MW

Capacity

1

Components

Wind

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 10m

Schedule

9 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-07-31

About

PJM-AH1-254 is a proposed wind generation project with a total capacity of 207.6 MW. The project is located in Barbour County, West Virginia, and is being developed within the PJM Interconnection region. The project entered the PJM queue on September 10, 2021, with a proposed commercial operation date of July 31, 2025. Its interconnection agreement status is listed as "In Progress (unknown study)".

The proposed project is interconnected to the APS utility grid at the Greenland Gap 500 kV II point of interconnection.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Barbour

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Greenland Gap 500 kV II

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
GREENGAP35 KV G1
POI Substation
Greenland Gap Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.