PJM-AH1-254
207.6 MW generation in Barbour, WV · In queue since September 2021 · Proposed COD July 2025
207.6 MW
Capacity
1
Components
Wind
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 10m
Schedule
9 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-07-31
PJM-AH1-254 is a proposed wind generation project with a total capacity of 207.6 MW. The project is located in Barbour County, West Virginia, and is being developed within the PJM Interconnection region. The project entered the PJM queue on September 10, 2021, with a proposed commercial operation date of July 31, 2025. Its interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project is interconnected to the APS utility grid at the Greenland Gap 500 kV II point of interconnection.
Generated from interconnection queue and public data sources
State
WV
County
Barbour
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Greenland Gap 500 kV II
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GREENGAP35 KV G1
- POI Substation
- Greenland Gap Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-254