Project PJM-AH1-255 — Project Summary

Queue ID
PJM-AH1-255
Capacity
240 MW
Technology
Battery
Status
active
Location
Grant, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-255

PJM-AH1-255BetaActiveBatteryPJMLBNL

240 MW storage in Grant, WV · In queue since September 2021 · Proposed COD July 2025

240 MW

Capacity

1

Components

Battery

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 10m

Schedule

9 months past proposed COD

In Study38%
Queue EntrySep 9, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-07-31

About

PJM-AH1-255 is a proposed 240 MW battery storage project located in Grant County, West Virginia. The project, which consists entirely of battery storage, is interconnected within the PJM Interconnection queue. The queue entry date is September 9, 2021, with a proposed commercial operation date of July 31, 2025.

The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Greenland Gap III substation, and the interconnecting utility is APS. The developer is unknown.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Grant

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Greenland Gap III

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
GREENGAP35 KV G1
POI Substation
Greenland Gap Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.